Post Pre-Drywall Meeting

So, if you’ve ever wanted to hear the phrase “this is not a custom build” or “we are a production builder”, then you’ll…

Pre-Pre Drywall Walkthrough 7/3

Seeing that the framing is finished, and noticing that the HVAC stuff was no longer on the first floor, we asked our project…

Roof Framing Going Up 6/26

So, it was neat to watch the crane bring those roof supports in. The giant triangle shaped end caps are simply massive. I…

Tornado and Rain Week 5/27

Well. Our house at 315 S 3rd survived the passing tornado, but our dig site here at 420 Rebekah became a giant inground…

Dig Week 5/20

We were SO excited for dig week. So many weeks of paperwork leading up to this point. Loan approvals, credit checks, and stress-filled…